OEM & ODM
How we work
From your requirements to a shipped unit
Six steps from a technical brief to a container on the water. Each step has a defined output you can verify before the next one begins.
- 1
Requirements
You send the application, flow rate, pressure and target market. We confirm feasibility against our standard range before quoting.
Feasibility confirmed
- 2
Specification freeze
P&ID, electrical schematic, gas purity targets and the regulatory target market are fixed in writing.
Signed by both sides
- 3
Engineering & DFM
We verify compressor, molecular sieve and vessel plate certificates, release the 3D STEP / IGES model and sign off the control logic.
3D STEP / IGES released
- 4
Prototype & FAT
A prototype unit runs continuously for 72 hours; pressure vessels undergo hydro-pneumatic testing before any series production.
72-hour continuous run
- 5
Mass production
Batch material traceability is recorded throughout, including mill test certificates for steel and lot logs for valves and sensors.
Full batch traceability
- 6
QC & documentation
Leak check by helium or soap bubble, hipot test and calibration certificates, then the as-built file, manuals and spare parts catalogue.
Technical file handed over
You receive the technical file, the manuals and a traceable serial number — the unit is yours to operate, service and resell.
Engagement models
Two ways to work with us
Start from a proven platform or redesign the product around your own requirements.
OEM / Private Label
Our engineered core assemblies are rebranded to your specification, with a project-dependent minimum order quantity. Factory acceptance test, technical file transfer and legal manufacturer technical construction file handover support are included.
ODM / Custom Development
Flow and pressure profile redesign, structural enclosure and PLC / HMI localisation, under an NRE plus volume commitment. Prototype build, 3D STEP / IGES release, chamber hydro or pressure test and CE / ISO technical dossier input are included.
Manufacturing base
What sits behind the work
Four things a buyer can check before placing an order: the site, the quality system, the intellectual property and the packing.
30,000 m² in Chengdu
R&D and manufacturing on one site, so engineering changes reach the production floor in days rather than weeks.
ISO-aligned quality management
Quality frameworks for medical devices, and national standard drafting participation for hyperbaric oxygen chambers.
68 national patents
Including 7 invention patents and 33 software copyrights, covering the low-pressure oil-free VPSA / VSA process architecture.
Export-grade packing
Fumigation-free plywood crates, desiccant vacuum barrier bags and shock-absorbing foam blocking for acrylic and steel doors.
- 30,000 m²
- R&D and manufacturing base in Chengdu, China
- 68
- National patents, including 7 invention patents
- 40%
- Lower specific energy vs. traditional PSA
- 72 h
- Continuous prototype run before series production
Customisation Matrix What can be adjusted on an OEM or ODM unit, and what stays fixed.
Oxygen output and purity — Output: 5–60 Nm³/h per unit as the standard baseline, with skidded modular scaling up to acute-care central plant integration. Purity: 93% ± 3% (VPSA / VSA), with dew point control and multi-stage medical filtration. Engineering constraint: molecular sieve ageing curve against cycle pressure.
Chamber pressure and volume — Soft-sided chambers 1.3–1.5 ATA, rigid chambers 1.5–3.0 ATA. Chamber geometry, port configuration including EEG / ECG feedthroughs, and seating or stretcher layout. Engineering constraint: ASME / GB / ISO pressure vessel code compliance.
Control system — Siemens or Delta PLC with touch HMI. Multi-language UI and Modbus / BACnet hospital BMS integration. Watchdog timer and failsafe pneumatic dump valve.
Enclosure and branding — Powder-coated steel or industrial white as standard. Custom RAL colour, laser-etched nameplates and silk-screened interface graphics. UV and abrasion resistance rating on request.
Lifecycle & Field Support Consumables and wear schedule — Molecular sieve replacement expected at 5–8 years, depending on operating hours and dew point. Compressor overhaul and ring-seal service at 16,000–24,000 runtime hours.
Field support — Remote PLC / HMI telemetry diagnostics, modular drop-in replacement skids, and regional partner or factory direct spare-parts dispatch for compressor valves and sensor calibration kits.
Regulatory support — Risk management file per the ISO 14971 framework, IEC 60601-1 alignment data where applicable, and complete technical construction file handover for the client acting as legal manufacturer.
RFQ Checklist Send the following to start a technical alignment:
Intended application — clinical central supply, mobile or containerised, or hyperbaric multi-place / monoplace.
Flow rate (Nm³/h) and delivery pressure (MPa), or chamber ATA and patient capacity.
Electrical grid standard — voltage, frequency and phase.
Target regulatory framework — CE-MDD / MDR roadmap, ISO 13485 alignment, local import registration support.
Estimated annual volume or batch size — for bulk pricing tier.